Kingwood Middle School
BIM Modelling, attended coordination meetings, Clash resolution, and Shop Drawings. As-built changes to drawings. Project Scope: Electrical (3 floors) Location: 2407 PINE TERRACE DR, KINGWOOD,
BIM Modelling, attended coordination meetings, Clash resolution, and Shop Drawings. As-built changes to drawings. Project Scope: Electrical (3 floors) Location: 2407 PINE TERRACE DR, KINGWOOD,
It is a student Center. Scope- Plumbing, Mechanical (HVAC and Piping General Contractor- BIG D COMPANIES Location- Orem, UT
It is an Amazon Fulfillment center with Underground and 5 levels, divided into 3 zones. With around 11k lighting fixtures and long runs of conduits
The Project consists of open Hanger space and covered space for the airport. BIM coordination was for Underground, Level 1 and 2 for the trades
The Project consists of new ground up, mixed use building to include 3 levels of below grade parking garage with 3 levels of retail/office/restaurant shell
The project consists of identical Residential Apartments for 6 levels with one level basement for parking. BIM coordination was done typical apartment and would be
Carmel Elementary School, located in Carmel, IN, serves a population of approximately 590 students, kindergarten through grade 5. School facilities include classrooms, computer lab, media
Worthingway Middle School is a single-story, 65,587 square foot brick school building located in a suburban residential setting. This project is a renovation and addition
The hospital is slated for a site at the northwest corner on land contributed by the San Antonio Medical Foundation. This project is expected to
This project is concerned with the renovations of two fully designed buildings 310 and 333 located at JBSA-Lackland AFB. The project delivery method is Design-Bid-Build