This project involves the construction of a new Military Working Dog (MWD) Kennel Facility at Peterson Air Force Base (AFB). This project is to construct a new 4,510 SF Kennel/Administration Facility, obedience training area, and exercise area for Canine and support personnel. Kennel will include ten (10) indoor kennels with dog houses. An Administration Facility will be attached to the Kennel Facility and will be sized for one Kennel master, two trainers, and handlers. This project will also include the demolishment of the existing Dog Kennel facility. Other primary areas of administration will include exam/solitude room, food prep room, and small locker room with showers at FE Warren AFB, WY.
Scope- BIM Coordination
Project Synopsis:
BIM coordination of a single storey including an admin block and the kennel. A detailed BIM Execution Plan (BEP) was prepared and shared with everyone involved in coordination. As a part of BIM Coordination, trades’ representatives got together on weekly basis to discuss clashes in a combined trades’ model. For each meeting, a Navisworks Document (.nwd) was developed with viewpoints reflecting clashes assigned to trades. Items like running a clash test, suggesting solutions to resolve the clashes, generation of RFI’s and ASI’s are discussed in the hour long weekly meetings.
General Contractor- JE Hurley Inc.
Architect- FourFront Design Inc.
Category- Government
Location- Colorado