portfolio

Rockport

Rockport

  • Project Area: 4963 Sq. ft.
  • LOD: Trades Floor Finish
  • Software: AutoCAD
41 Bank st

41 Bank St

  • Project Area: 1996.2 Sq. ft./ 2368 Sq. ft.
  • LOD: Trades Front Elevation
  • Software: AutoCAD

Hubbard Powis

  • Project Area: 1996.2 Sq. ft./ 2368 Sq. ft.
  • LOD:
  • Trades Covered: Lighting
  • Software: AutoCAD

Haviland

  • Project Area: 4771.32 Sq. ft.
  • LOD:
  • Trades Covered:
  • Software: AutoCAD
Spillway Bridge

Spillway Bridge

  • Project Area:
  • Architect: N/A
  • Engineer: N/A
  • Contractor(S): N/A
  • Owner: N/A
  • LOD:
  • Trades Covered: AS BUILT
  • Software: MicroStation
  • Verticals: 2023
Bank Daze

Bank Daze

  • Project Area:
  • Architect: N/A
  • Engineer: N/A
  • Contractor(S): N/A
  • Owner: N/A
  • LOD:
  • Trades Covered: AS BUILT
  • Software: AutoCAD
  • Verticals: 2021

Eufaula Replace Spillway Bridge

  • Project Area:
  • Architect: N/A
  • Engineer: N/A
  • Contractor(S): N/A
  • Owner: N/A
  • LOD:
  • Trades Covered: AS BUILT
  • Software: MicroStation
  • Verticals: 2023

Communities In Schools Central Texas

  • Project Area: 6085 sq ft
  • Architect: N/A
  • Engineer: N/A
  • Contractor(S): BIM SERVICES LLC
  • Owner: N/A
  • LOD: 350
  • Trades Covered: Plumbing, Shop Drawing, As -Built
  • Software: Revit Fabrication 2021
  • Verticals: Plumbing

 

Challenges and Solutions

Challenge 1: Ceiling Space Constraints

  • Issue:
    • Condensate drain pipe clashed with ceiling and fire protection pipes below ceiling.
  • Solutions:
    • Drop ceiling to accommodate pipes.
    • Use a pump for condensate drain at units.
    • Reduce pipe run length by dropping pipe into nearest mop sink.

Challenge 2: Exposed Plumbing Risers in Rooms

  • Issue:
    • Plumbing risers exposed or in the middle of rooms per design.
  • Solution:
    • Coordinate and reroute plumbing pipes to conceal or relocate them appropriately.

Mardela Middle & High School

  • Project Area: 118,993 sq ft
  • Architect: N/A
  • Engineer: N/A
  • Contractor(S): Not specified
  • Owner: Not specified
  • LOD: 400
  • Trades Covered: Plumbing, Shop Drawing, As-Built
  • Software: Revit Fabrication 2021
  • Verticals: Plumbing

 

Challenges and Solutions:

Challenge 1: Coordination in Corridors

  • Issue:
    • Congested corridors with units, refrigerant pipes, light fixtures, and fire protection (FP) systems.
  • Solution:
    • Relocated units to adjacent rooms to clear space in corridors, resolving clashes with other trades. Changes were submitted for approval.

Challenge 2: Concurrent Modeling and Fieldwork

  • Issue:
    • Modelling, coordination, and drawing submissions overlapped with fieldwork, posing challenges for accuracy and documentation.
  • Solution:
    • Implemented a ‘Deliverable Log’ to track revisions and provide links to the latest drawings/models. Mobilised resources to ensure timely and accurate delivery of multiple deliverables to the client.