UMC

University Medical Center (UMC) building exterior
  • Project Area: 221,480 sq ft
  • Architect: HDR ARCHITECTURE INC.
  • Engineer: HUGO REED AND ASSOCIATES INC.
  • Contractor(S):
    Owner: UMC HEALTH SYSTEM
  • LOD: 350
  • Trades Covered: Plumbing, Shop Drawing, As -Built
  • Software: Revit Fabrication 2021
  • Verticals: Plumbing

 

Challenges and Solutions:

Challenge 1: Transition to Design-Build Project

  • Issue:
    • Originally scoped for HVAC, Mechanical Piping (MP), and Plumbing modeling and coordination, the project faced design issues and frequent updates.
  • Solution:
    • Team provided proactive solutions after validating feasibility in the model, engaging GC, MEPF, and designers in weekly meetings. Detailed RFIs with before-and-after model snapshots were shared to enhance communication and efficiency.

Challenge 2: Facility Maintenance Considerations

  • Issue:
    • Hospital environment required careful planning for equipment and elements accessibility post-installation, including valves and dampers.
  • Solution: 
    • Added clearances to floor-mounted and ceiling-mounted equipment to facilitate maintenance access. Clash tests with other trades and architectural elements were conducted to identify and resolve issues pre-installation.
    • Scheduled periodic BIM meetings with the Facility Maintenance team to ensure compliance with city requirements and thorough quality checks before installation.

Gallery

FAQS:

Answers That Build Clarity

No FAQs found.

BIM enhances construction by enabling accurate planning, real-time collaboration, and clash-free coordination. It helps project teams visualize each stage before construction begins, improving scheduling, cost estimation, and risk management. Contractors, architects, and engineers rely on BIM modeling services to deliver projects faster, with fewer changes and lower costs.

Thank you

You've been successfully unsubscribed.