Mardela Middle & High School

  • Project Area: 118,993 sq ft
  • Architect: N/A
  • Engineer: N/A
  • Contractor(S): Not specified
  • Owner: Not specified
  • LOD: 400
  • Trades Covered: Plumbing, Shop Drawing, As-Built
  • Software: Revit Fabrication 2021
  • Verticals: Plumbing

 

Challenges and Solutions:

Challenge 1: Coordination in Corridors

  • Issue:
    • Congested corridors with units, refrigerant pipes, light fixtures, and fire protection (FP) systems.
  • Solution:
    • Relocated units to adjacent rooms to clear space in corridors, resolving clashes with other trades. Changes were submitted for approval.

Challenge 2: Concurrent Modeling and Fieldwork

  • Issue:
    • Modelling, coordination, and drawing submissions overlapped with fieldwork, posing challenges for accuracy and documentation.
  • Solution:
    • Implemented a ‘Deliverable Log’ to track revisions and provide links to the latest drawings/models. Mobilised resources to ensure timely and accurate delivery of multiple deliverables to the client.