- Project Area: 118,993 sq ft
- Architect: N/A
- Engineer: N/A
- Contractor(S): Not specified
- Owner: Not specified
- LOD: 400
- Trades Covered: Plumbing, Shop Drawing, As-Built
- Software: Revit Fabrication 2021
- Verticals: Plumbing
Challenges and Solutions:
Challenge 1: Coordination in Corridors
- Issue:
- Congested corridors with units, refrigerant pipes, light fixtures, and fire protection (FP) systems.
- Solution:
- Relocated units to adjacent rooms to clear space in corridors, resolving clashes with other trades. Changes were submitted for approval.
Challenge 2: Concurrent Modeling and Fieldwork
- Issue:
- Modelling, coordination, and drawing submissions overlapped with fieldwork, posing challenges for accuracy and documentation.
- Solution:
- Implemented a ‘Deliverable Log’ to track revisions and provide links to the latest drawings/models. Mobilised resources to ensure timely and accurate delivery of multiple deliverables to the client.