The Chocolate Factory

  • Project Area: 263,052 sf
  • Architect: N/A
  • Engineer: N/A
  • Contractor(S): N/A
  • Owner: N/A
    LOD: 400
  • Trades Covered: Mechanical, Shop Drawings, Spools Coordination
  • Software: Revit Fabrication 2020
  • Verticals: Mechanical

 

Challenges and Solutions:

Challenge 1: Support Details

  • Issue:
    • Detailed support system for mechanical pipes required precise coordination and installation.
  • Solution:
    • Implemented 3-D simulations and regular on-site visual checks to ensure accurate placement and coordination of supports, addressing the project’s meticulous requirements effectively.

Challenge 2: Simultaneous Coordination and Construction

  • Issue:
    • Coordinating as-built conditions while construction progressed on site posed challenges in tracking virtual progress versus actual construction.
  • Solution:
    • Established a rigorous schedule and clear communication protocols to manage real-time issues and resolutions. Constantly updated models and provided outputs to the site ensure smooth project execution during the final stages.