UMC

  • Project Area: 221,480 sq ft
  • Architect: HDR ARCHITECTURE INC.
  • Engineer: HUGO REED AND ASSOCIATES INC.
  • Contractor(S):
    Owner: UMC HEALTH SYSTEM
  • LOD: 350
  • Trades Covered: Plumbing, Shop Drawing, As -Built
  • Software: Revit Fabrication 2021
  • Verticals: Plumbing

 

Challenges and Solutions:

Challenge 1: Transition to Design-Build Project

  • Issue:
    • Originally scoped for HVAC, Mechanical Piping (MP), and Plumbing modeling and coordination, the project faced design issues and frequent updates.
  • Solution:
    • Team provided proactive solutions after validating feasibility in the model, engaging GC, MEPF, and designers in weekly meetings. Detailed RFIs with before-and-after model snapshots were shared to enhance communication and efficiency.

Challenge 2: Facility Maintenance Considerations

  • Issue:
    • Hospital environment required careful planning for equipment and elements accessibility post-installation, including valves and dampers.
  • Solution: 
    • Added clearances to floor-mounted and ceiling-mounted equipment to facilitate maintenance access. Clash tests with other trades and architectural elements were conducted to identify and resolve issues pre-installation.
    • Scheduled periodic BIM meetings with the Facility Maintenance team to ensure compliance with city requirements and thorough quality checks before installation.