Universal Studios

visual project showcases

UNIVERSAL STUDIOS

  • Project Area: 541 acre
  • Architect: N/A
  • Engineer: N/A
  • Contractor(S): N/A
  • Owner: N/A
  • LOD: 500
  • Trades Covered: Site Electrical Utilities
  • Software: Revit Fabrication 2022
  • Verticals: Electrical

Challenges and Solutions:

Challenge 1: Coordinating area development
Solution: The sheer vastness needed to be coordinated with tones of conduits and handholds along with multiple trades was extremely challenging. With multiple elements and constant construction on site, keeping a log and tab on the changes is a humongous task. Having a thorough schedule and timeline helps keep things working in a smooth flow and deliverables sent on time. Eyes on the field and data received being incorporated on a timely basis are the keys to having successful coordination on a live site work.

Challenge 2: Modeling As-builts along with coordination
Solution: Along with the coordination of Electrical elements and conduits, the same is being installed and constructed on-site. Having to model the proposed and then revise the same to as-built with the site data is a time-consuming task. Keeping the model updated and not having duplicate data as much as possible is the goal. To achieve the same, we have segregated the proposed and As-built models to have as much of a clean slate for the inputs and constantly send the proposed data on-site for installation.

Gallery

FAQS:

Answers That Build Clarity

No FAQs found.

BIM enhances construction by enabling accurate planning, real-time collaboration, and clash-free coordination. It helps project teams visualize each stage before construction begins, improving scheduling, cost estimation, and risk management. Contractors, architects, and engineers rely on BIM modeling services to deliver projects faster, with fewer changes and lower costs.

Thank you

You've been successfully unsubscribed.