Myo Palate
Project Area: Architect: N/A Engineer: N/A Contractor(S): N/A Owner: N/A LOD: 350 Trades Covered: SHOP DRAWING Software: REVIT Verticals: 2021
Tesla Giga Texas – Cell Phase 2 (Elevator)
Project Area: Architect: N/A Engineer: N/A Contractor(S): N/A Owner: N/A LOD: 350 Trades Covered: SHOP DRAWING Software: REVIT Verticals: 2023
Rockport
Project Area: 4963 Sq. ft. LOD: Trades Floor Finish Software: AutoCAD
41 Bank St
Project Area: 1996.2 Sq. ft./ 2368 Sq. ft. LOD: Trades Front Elevation Software: AutoCAD
Hubbard Powis
Project Area: 1996.2 Sq. ft./ 2368 Sq. ft. LOD: Trades Covered: Lighting Software: AutoCAD
Haviland
Project Area: 4771.32 Sq. ft. LOD: Trades Covered: Software: AutoCAD
Spillway Bridge
Project Area: Architect: N/A Engineer: N/A Contractor(S): N/A Owner: N/A LOD: Trades Covered: AS BUILT Software: MicroStation Verticals: 2023
Bank Daze
Project Area: Architect: N/A Engineer: N/A Contractor(S): N/A Owner: N/A LOD: Trades Covered: AS BUILT Software: AutoCAD Verticals: 2021
Eufaula Replace Spillway Bridge
Project Area: Architect: N/A Engineer: N/A Contractor(S): N/A Owner: N/A LOD: Trades Covered: AS BUILT Software: MicroStation Verticals: 2023
Communities In Schools Central Texas
Project Area: 6085 sq ft Architect: N/A Engineer: N/A Contractor(S): BIM SERVICES LLC Owner: N/A LOD: 350 Trades Covered: Plumbing, Shop Drawing, As -Built Software: Revit Fabrication 2021 Verticals: Plumbing Challenges and Solutions Challenge 1: Ceiling Space Constraints Issue: Condensate drain pipe clashed with ceiling and fire protection pipes below ceiling. Solutions: Drop ceiling […]