The Differences Between 3D, 4D, 5D and 6D BIM LOD’s

3D, 4D, 5D and 6D BIM LOD’s

Quick clarity before we dive in: BIM dimensions (3D/4D/5D/6D) describe what kind of information you manage (geometry, time, cost, operations). LOD (Level of Development) describes how reliable/detailed that information is (100–500). They work together, but they’re not the same thing.

3D, 4D, 5D and 6D BIM LOD’s

3D BIM – Geometry & Location

3D is your coordinated model-the place where architecture, structure, and MEPF live together so clashes surface before site. It drives drawings, shop details, and early quantities for bim and construction teams. On a hospital project, a federated model might reveal a cable tray clipping a sprinkler main; you tweak elevations and fittings in the model and avoid a weekend of rework. For a deeper dive on detail targets, see our guide on Levels of Development (LOD) in BIM.

  • Use it for design coordination, clash resolution, drawings, takeoffs.
  • Two pitfalls to dodge: over-modeling at LOD 400 “because we can,” and late federation that snowballs into clashes.

Related reading: What Is BIM in Construction?

4D BIM – Time & Sequencing

4D links the model to your schedule so the plan is visible-and testable-before anyone mobilizes. It’s not a “movie”; it’s a decision tool. Think of a data center fit-out where raised floor, trays, and rack deliveries collide. A quick 4D run exposes the conflict, you re-sequence, and you don’t lose your weekend. For document control that supports the plan, see BIM 360 Document Management.

  • Use it for phasing, site logistics (cranes, laydown, access), weekly look-aheads.
  • Key discipline: break work by zone/system; don’t hide everything in one “MEP install” task.

5D BIM – Cost & Quantities

5D ties model quantities to cost items so budgets move with design. When a façade switches from ACP to terracotta, areas and line items update; the owner sees CapEx deltas in time to choose, not after procurement. Confidence comes from clean classifications, explicit measurement rules, and versioned cost libraries-especially if you engage in BIM outsourcing services for surge estimating support.

  • Use it for early budgets with stated confidence, VE comparisons, and change control.
  • Publish your LOD and assumptions; dirty families and vague types = garbage in, garbage out.

6D BIM – Operations & Facility Management

6D captures asset data you’ll actually use after handover: tags, serials, warranties, O&M links-tied to spaces and systems. In a university lab, scanning a QR on an autoclave should pull up its model location, isolation diagram, warranty end date, and last service-no hunting, no guesswork. If you’re planning the handover, align 6D requirements early with architectural drafting services and MEP BIM services so those fields are captured during design/fabrication. Read: How BIM Enhances Facility Management.

  • Use it for preventive maintenance, faster troubleshooting, and long-term capital planning.
  • Keep it lean: asset ID, system, space, make/model, serial, warranty, PM frequency, O&M link, vendor contact-and integrate with the owner’s CMMS.

Where LOD Fits (keep it practical)

Use LOD 100–200 for concept and rough 5D ranges, LOD 300 for coordinated design and reliable clash checks, LOD 350–400 where you fabricate and install (this is where MEPF services really earn their keep), and LOD 500 for verified as-built seeds. Rule of thumb: model to decisions, not vanity-raise LOD only where it changes scope, cost, or sequence.

Also see: Architectural BIM Services vs Traditional CAD Design

One Scope, Four Dimensions (short walkthrough)

Replacing a central chiller in a live hospital: 3D confirms geometry, access, and rigging paths; 4D sequences isolation → weekend changeover → crane day → commissioning; 5D rolls quantities into line items and compares high-efficiency vs. base chiller CapEx/Opex; 6D locks in serials, warranties, PM intervals, and a QR that opens the exact CMMS asset.

Implementation Essentials

Get the finish line defined in the BEP and contract-what 4D/5D/6D deliverables are due, when, and to what standards. Standardize parameters (systems, zones, asset IDs) so 4D links, takeoffs, and FM fields don’t crumble later. Use 4D in weekly coordination, publish 5D assumptions and confidence on every estimate, and keep 6D lean enough that FM will actually maintain it.

  • Three must-haves: a clear data-drop plan, governed cost libraries, and live CMMS integration.

Final take

Use the dimensions where they change decisions: 3D to build right, 4D to build in the right order, 5D to spend right, 6D to operate right. Keep LOD aligned to milestones, and weave in architectural bim modeling, architectural drafting services, and mep bim service where they add measurable value-not noise.

FAQ's

Dimensions describe what kind of information you’re managing: 3D = geometry, 4D = time, 5D = cost, 6D = operations/FM. LOD (100–500) describes how reliable and detailed that information is at a given stage. You can have a 4D (time-linked) plan based on LOD 200 geometry, or a 5D estimate from LOD 300 quantities-the point is to match LOD to the decisions being made. If you’re deep in bim and construction, lock this in your BEP: which dimensions are required, target LOD per milestone, and acceptance criteria. That discipline avoids over-modeling, under-informing, and budget surprises.
3D federates architecture, structure, and MEPF so you can see and resolve conflicts before site. Compared to 2D overlays, you get accurate spatial relationships, system routing, and maintainable clearances. Architectural drafting services still matter (permit sets, shop drawings), but they’re generated from the model-reducing manual errors. With architectural bim modeling, you standardize families, parameters, and shared coordinates, which makes downstream clash detection and takeoff reliable. Net result: fewer RFIs, cleaner submittals, and tighter field installation.
4D links tasks in P6/MS Project to actual model elements and zones, so you simulate phasing, trade handoffs, crane placements, and access paths before mobilization. In bim and construction work like hospital renovations, you can visualize shutdown windows, decant areas, and infection control boundaries. Weekly 4D updates turn the simulation into a look-ahead meeting tool-you catch stacked trades in the same room, resequence, and avoid Saturday rework. It’s not a “movie”; it’s how you make the plan believable.
Three things: (1) Clean classifications-systems, types, materials, and assemblies must be consistent so quantities roll up correctly; (2) Measurement rules-face vs. centerline, opening treatment, overlaps-published with each estimate; (3) Governed cost libraries-location factors, escalation, and vendor quotes under version control. If your team is stretched, bim outsourcing services can maintain cost catalogs, normalize families, and automate quantity mapping so design changes flow into estimates without manual surgery.
6D is about usable asset data: tag, system, space, make/model, serial, warranty end, PM intervals, and O&M links-ideally barcoded/QR-coded and synced with the owner’s CMMS. When an FM tech scans a pump, they should see isolation valves, last service date, and spare part numbers. This depends on trades and mep bim services feeding verified serials and submittal metadata back into the model. Treat 6D as a “minimum viable dataset” that ops will actually maintain. That’s where mepf services (mechanical, electrical, plumbing, fire) are critical-each asset’s maintainable clearances and documentation must be modeled and checked.
Start with 3D (clash avoidance) and 4D (sequence/logistics). Those two slash RFIs, compress schedules, and reduce rework quickly. Bring in 5D where choices are in flux (façade, MEP routing, alternates). Roll 6D requirements into submittals so you don’t scramble at handover. If bandwidth is your constraint, leverage bim outsourcing services for spike workloads-model clean-up, parameter audits, quantity mapping-so your core team focuses on decisions, not grunt work.