For this Communities In Schools of Central Texas facility, BIM Services delivered plumbing shop drawings and as-built documentation across a compact, 6,085-square-foot building footprint. The scope focused on resolving tight ceiling clearances and concealing exposed plumbing risers, ensuring the finished plumbing system stayed clash-free, fabrication-ready, and true to the building’s architectural design intent.
Project Summary
- Plumbing shop drawing and as-built documentation for a 6,085 sq ft facility
- Condensate drain piping rerouted to resolve clashes with ceiling and fire protection systems
- Dropped ceiling design and pump-assisted drainage implemented to protect available clearance
- Exposed plumbing risers coordinated and rerouted to keep occupied rooms clear
- LOD 350 modeling delivered in Revit Fabrication 2021 for field-ready plumbing installation
Project Snapshot
| Project Area | 6,085 sq ft |
| Contractor(s) | BIM Services LLC |
| LOD | 350 |
| Trades Covered | Plumbing, Shop Drawing, As-Built |
| Software | Revit Fabrication 2021 |
| Verticals | Plumbing |
Resolving Ceiling Space Constraints on Condensate Drain Piping
A tight ceiling cavity left little room for the condensate drain pipe to coexist with the fire protection piping already routed below the ceiling. Our 3D clash coordination process identified the conflict early and resolved it through:
- A dropped ceiling section designed to accommodate the condensate drain pipe alongside existing fire protection piping
- A pump-assisted condensate drain solution installed at the units to work within limited ceiling clearance
- Pipe run length reduced by routing the condensate drain into the nearest mop sink
Concealing Exposed Plumbing Risers
The original design left several plumbing risers exposed, running through the middle of occupied rooms. This work included:
- Plumbing risers coordinated and rerouted to keep them out of sightlines within finished spaces
- Riser paths relocated to align with adjacent walls and service chases rather than open room areas
- Coordination carried out to preserve the facility’s intended room layouts and finishes
Fabrication-Ready Shop Drawings and As-Built Accuracy
Every resolved clash and rerouted pipe run was carried through into precise, field-ready shop drawings modeled at LOD 350 in Revit Fabrication 2021. Key outcomes included:
- Detailed plumbing shop drawings supporting accurate fabrication and installation
- Condensate drain and riser routing documented for a smooth installation sequence
- As-built documentation delivered to reflect the final, coordinated plumbing layout
BIM Coordination Across a Compact Facility
Working within a smaller building footprint made disciplined BIM coordination essential, since every pipe run had to compete for limited ceiling and wall space. Our team:
- Coordinated plumbing systems against ceiling, fire protection, and architectural constraints before installation
- Delivered field-ready documentation to keep the plumbing scope on schedule
- Supported a facility built to serve Communities In Schools of Central Texas’s mission with a clean, code-compliant plumbing installation
The Communities In Schools Central Texas project reflects how BIM Services applies precise clash detection, coordinated rerouting, and fabrication-ready shop drawings to deliver clean plumbing installations even within compact building footprints. For more examples of our work in this sector, explore our institutional and community facilities portfolio.