Across 263,052 square feet of manufacturing space, BIM Services delivered mechanical modeling, shop drawings, and mechanical spool coordination for The Chocolate Factory. The scope centered on precisely coordinating mechanical pipe support systems and keeping the model synchronized with real-time construction progress as the facility moved through its final build-out stages.
Project Summary
- Mechanical modeling, shop drawings, and Mechanical spool coordination across 263,052 sq ft of manufacturing space
- Detailed mechanical pipe support systems coordinated through 3D simulation
- Regular on-site visual checks confirming accurate support placement and installation
- As-built conditions tracked continuously against live, on-site construction progress
- LOD 400 modeling delivered in Revit Fabrication 2020 for accurate, fabrication-ready mechanical documentation
Project Snapshot
| Project Area | 263,052 sf |
| LOD | 400 |
| Trades Covered | Mechanical Spool Coordination, Shop Drawings |
| Software | Revit Fabrication 2020 |
| Verticals | Mechanical |
Coordinating Detailed Mechanical Spool Coordination
A manufacturing facility of this scale runs on mechanical piping that has to be precisely supported throughout the structure. Our BIM 3D modeling team addressed this through:
- 3D simulations run to ensure accurate placement and coordination of mechanical pipe supports
- Regular on-site visual checks confirming that modeled supports matched field conditions
- Ongoing verification helping catch discrepancies before they affected installation
- Support system detailing carried out to meet the project’s meticulous coordination requirements
- Support placement documented to prevent conflicts with adjacent mechanical and structural elements
Mechanical Spool Coordination for Fabrication-Ready Piping
Precise mechanical piping across a facility this size depends on accurate spool drawings prepared alongside the coordinated model. This work included:
- Mechanical Spool coordination carried out across the mechanical piping scope
- Fabrication-ready piping details prepared to streamline installation
- Spool-level detail coordinated to minimize on-site cutting and fitting adjustments
- Support and spool documentation aligned to reduce field rework
- Mechanical piping runs sequenced to support efficient fabrication and delivery to the site
Tracking As-Built Conditions During Live Construction
Coordinating as-built conditions while construction was actively progressing on site created a constant challenge of tracking virtual progress against actual field conditions. Key outcomes included:
- A rigorous schedule and clear communication protocols established to manage real-time issues
- Models constantly updated to reflect the latest on-site construction progress
- Outputs provided to the site to support smooth project execution through the final build stages
- Discrepancies between model and field conditions addressed promptly to keep progress on track
Fabrication-Ready Shop Drawings and Field Coordination
Every coordinated support and spool detail was carried through into precise, field-ready shop drawings modeled at LOD 400 in Revit Fabrication 2020. Our team:
- Delivered detailed mechanical shop drawings supporting accurate fabrication and installation
- Kept documentation synchronized with real-time construction updates
- Supported a smooth handoff as the facility neared completion
The Chocolate Factory project reflects how BIM Services applies precise 3D simulation, disciplined Mechanical spool coordination, and real-time as-built tracking to deliver accurate mechanical infrastructure across large manufacturing facilities during active, fast-moving construction schedules. For more examples of our work in this sector, explore our industrial portfolio.